Installation Manual
Energy Storage Battery
SMILE-BAT-G3-10.1P
V01

Advertisement

Table of Contents
loading

Summary of Contents for Alpha ESS SMILE-BAT-G3-10.1P

  • Page 1 Installation Manual Energy Storage Battery SMILE-BAT-G3-10.1P...
  • Page 3: Imprint

    Web: www.alpha-ess.com Add: JiuHua Road 888, High-Tech Industrial Development Zone 226300 Nantong City, Jiangsu Province Australia Alpha ESS Australia Pty. Ltd. Tel.: +61 1300 968 933 E-mail: australia@alpha-ess.com Web: www.alpha-ess.com.au Add: Suite 1, Level 1, 530 Botany Road, Alexandria, NSW, 2015 ______________________________________________________________________ Alpha ESS Co., Ltd.
  • Page 4: Copyright Statement

    Copyright Statement Copyright Statement This manual is under the copyright of Alpha ESS Co., Ltd, with all rights reserved. Please keep the manual properly and operate in strict accordance with all safety and operating instructions in this manual. Please do not operate the system before reading through the manual.
  • Page 5: Table Of Contents

    General ....................13 Restricted Locations ................14 Barrier to habitable rooms ..............15 Installation ..................16 Connection ..................16 Grounding ....................16 Connect to inverter ................. 17 Connect Expansion Batteries ..............18 ______________________________________________________________________ Alpha ESS Co., Ltd. Page 3 of 29...
  • Page 6 Limitation of Liability ............... 24 7. Routine Maintenance ................25 Maintenance Plan ................25 Operating Environment ................25 Equipment Cleaning ................25 Cable, Terminal and Equipment Inspection..........25 Notes ....................25 Appendix:Datasheet .................. 27 ______________________________________________________________________ Alpha ESS Co., Ltd. Page 4 of 29...
  • Page 7: Introduction

    Introduction 1. Introduction Features The SMILE-BAT-G3-10.1P battery pack has the following features: Photovoltaic system: This battery pack is designed for household photovoltaic systems. Battery management system (BMS): The battery packs built-in BMS monitors its operation and prevents the battery from operating outside design limitations.
  • Page 8: Operator Requirements

    Danger de mort en raison de tensions élevées dans l'onduleur; respecter un temps d'attente de 10 minutes. The product must not be disposed of in household waste! Le produit ne doit pas être jeté avec les ordures ménagères! ______________________________________________________________________ Alpha ESS Co., Ltd. Page 6 of 29...
  • Page 9: Setting Of Warning Sign For Safety

    Battery Safety Datasheet 1.3.8.1 Hazard Information Classification of the hazardous chemical Lithium Iron Battery is Exempt from classification according to Australian WHS regulations. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 7 of 29...
  • Page 10 Hazardous materials may be released. Moreover, if heated strongly by the surrounding fire, acrid or harmful fume may be emitted. 1.3.8.2 Safety Datasheet The detailed information please refer to the provided battery safety datasheet, which is provided with the battery product. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 8 of 29...
  • Page 11: General Precautions

     Secure the system to prevent tipping with restraining straps in your vehicle.  The transportation of AlphaESS SMILE-BAT-G3-10.1P must be made by the manufacturer or an instructed personal. These instructions shall be recorded and repeated.  A certified ABC fire extinguisher with minimum capacity of 2kg must be carried along when transporting.
  • Page 12 The battery is heavy. There is risk of injury if the battery is lifted incorrectly or dropped during transport or when attaching to or removing from the wall.  Lifting and transporting the inverter and battery must be carried out by more than 1 people. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 10 of 29...
  • Page 13: Parts List

    Transport damage (including painting scratch caused by rubbing inside packaging during shipping). A claim should be made directly to shipping or insurance company in this case as soon as the container/packaging is unloaded and such damage is identified; ______________________________________________________________________ Alpha ESS Co., Ltd. Page 11 of 29...
  • Page 14 The maintenance procedures relating to the product have not been followed to an acceptable standard;  Force majeure (violent or stormy weather, lightning, overvoltage, fire etc.);  Damages caused by any external factors. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 12 of 29...
  • Page 15: Installation

    This Manual introduces the basic steps how to install and operate AlphaESS battery system: SMILE-BAT-G3-10.1P series. SMILE-BAT-G3-10.1P is a sealed component with no access to battery terminals or cell components within module. SMILE-BAT-G3-10.1P contains a Bi-pole DC isolator, which conforms to IEC 60947. It has...
  • Page 16: Restricted Locations

    (e) within 900 mm of access to 240 Vac connections; within 600 mm of side of other equipment. A SMILE-BAT-G3-10.1P installed in any corridor, hallway, lobby or the like leading to a fire exit shall ensure sufficient clearance from the SMILE-BAT-G3-10.1P for safe egress and no less than 1 m.
  • Page 17: Barrier To Habitable Rooms

    300 mm beyond the vertical sides of the SMILE-BAT-G3-10.1P; (ii) to the extent of the bottom of the SMILE-BAT-G3-10.1P Where the top of the SMILE-BAT-G3-10.1P is within 1200 mm of the ceiling or structure above the SMILE-BAT-G3-10.1P the ceiling or structure surface shall be suitably non- combustible for an area of 600 mm past the extremities of the SMILE-BAT-G3-10.1P.
  • Page 18: Installation

    Φ10 drill bit to a depth of 80mm, inserted the gray expansion pipe into the wall, and then tightened the expansion screw. Connection Grounding Grounding point is at left side of the battery, please ensure the grounding before switch on the battery. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 16 of 29...
  • Page 19: Connect To Inverter

    Step 1: Connect the power cable from the battery to the inverter. Please put the power cable in the limit hole. Positive Power Cable Negative Power Cable Step 2: Connect the communcation cable from the battery to the inverter. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 17 of 29...
  • Page 20: Connect Expansion Batteries

    Your Smart Energy Installation Communication Cable Connect Expansion Batteries Connect the power cables and BMS cable between the batteries as the picture shown below. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 18 of 29...
  • Page 21: Switch On/Off And Display

    The second light 3S flashes once 45%=<SOC<50% Work: The second light is always on Green light flickering 10s 50%=<SOC<70% The third light 3S flashes once Battery state 70%=<SOC<75% The third light is always on ______________________________________________________________________ Alpha ESS Co., Ltd. Page 19 of 29...
  • Page 22 Your Smart Energy Switch On/Off and Display 75%=<SOC<95% The fourth light 3S flashes once SOC>95% The fourth light is always on PS: ESD monitoring is achieved via inverter monitoring ______________________________________________________________________ Alpha ESS Co., Ltd. Page 20 of 29...
  • Page 23: Error And Protection Code

    1 seconds. Close circuit breaker after Circuit Breaker Error 06 Shutting down battery Open system. Keep consistence Error 07 DIP difference switches, restart the system. Reconnect the communication Error 08 Disconnect cable ______________________________________________________________________ Alpha ESS Co., Ltd. Page 21 of 29...
  • Page 24 5 times within 10 seconds, the BMS will be forced to turn on MOS of discharge so that the battery voltage can be detected by the inverter and the battery can be charged. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 22 of 29...
  • Page 25: Emergency Situations

    Your Smart Energy Emergency Situations 5. Emergency Situations AlphaESS cannot guarantee SMILE-BAT-G3-10.1P absolute safety. Fire In case of fires, make sure that the following equipment is available near the system.  SCBA (self-contained breathing apparatus) and protective gear in compliance with the Directive on Personal Protective Equipment 89/686/EEC.
  • Page 26: Warranty

    The maintenance procedures relating to the product have not been followed to an acceptable standard;  Force majeure (violent or stormy weather, lightning, overvoltage, fire etc.). Damages caused by any external factors.  ______________________________________________________________________ Alpha ESS Co., Ltd. Page 24 of 29...
  • Page 27: Routine Maintenance

    Check that the grounding of the equipment is good and the grounding resistance is less than 10 ohms. Notes All these routine maintenances must be carried out by professional installer or staff of manufacturer. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 25 of 29...
  • Page 28 (that is, the batteries have not been charged for two weeks or longer) for a long time, in case of over discharge. Please contact us in time if there are any conditions that could not be explained in the manual. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 26 of 29...
  • Page 29: Appendix:datasheet

    The depth and height are the same for all battery systems. But at least 300mm clearance is necessary between each module for all battery systems. *** Under specific test conditions **** When the temperature is below 0 °C or above 40 °C, the performance will be limited. ______________________________________________________________________ Alpha ESS Co., Ltd. Page 27 of 29...