Alpha ESS eSTORE-BAT-10.3 Manual page 20

Battery module
Table of Contents

Advertisement

Your Smart Energy
Installation
Step18. Pass the communication cable through the cable gland and pass it into the
communication port of the battery.
Step19. Fixed the connector of the cable box power Cable to the inverter with 2 x M8*12
screws.
Note: Make sure the power cable passes through the cable gland and the terminal
color is required, Fixed with 4 x M3*8 screws.
Step 20. Install the power plugs between the battery and the cable box.
Note: Ensure that the color should be correct and the power plugs should be plugged
correctly.
______________________________________________________________________
Alpha ESS Co., Ltd.
Page 18 of 31

Advertisement

Table of Contents
loading

Table of Contents