Alpha ESS eSTORE-BAT-10.3 Manual page 21

Battery module
Table of Contents

Advertisement

Your Smart Energy
Installation
Step 21. Install the BACKUP and ON-GRID plugs between the inverter and the cable box.
Note that the inverter should be corresponded to the interface on the Cable Box.
Note: The gray wire interface is the Backup interface, and the cable is provided by the
customer. The wiring is as shown in the figure.
Step 22. Install the 2*MC4 terminals in a correct sequence and install them in the specified
position of the inverter.
______________________________________________________________________
Alpha ESS Co., Ltd.
Page 19 of 31

Advertisement

Table of Contents
loading

Table of Contents