Shut Down & Restart The Inverter; Shut Down Procedures; Restart The Inverter; Maintenance&Trouble Shooting - Afore HNS7000TL Installation And Operation Manual

On-grid pv inverter
Hide thumbs Also See for HNS7000TL:
Table of Contents

Advertisement

17
Shut Down & Restart the Inverter
6.Shut Down & Restart the Inverter

6.1 Shut Down Procedures

・Turn off the DC switch on the inverter;
・Turn off the PV switch of the system;
・Turn off the AC switch between inverter output and the public grid.
Note:
The inverter will be operable after minimum 5 minutes.

6.2 Restart the inverter

Follow the procedures below when the inverter needs to be restarted.
・Follow the Shut Down Procedures of Article 6 to shut down inverter;
・Follow the Commissioning Procedures of Article 5 to turn on the inverter.
7.Maintenance&Trouble Shooting

7.1 Maintenance

The inverter needs maintenance periodically, the following details should be
noticed.
PV connection: check the PV connection twice a year
AC connection: check the AC connection twice a year
Earth connection: check the Earth connection twice a year
Heat sink: clean the heat sink once a year with dry towel

7.2 Fault Code and Trouble Shooting

The LCD and LED will report the fault when the error occurs, please follow
thetrouble shooting list to solve the problem.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hns8000tl

Table of Contents