Transport And Installation; Conditions Of Supply, Transport And Storage - Ferroli NATURFIRE 30 HR Installation, Use And Maintenance Manual

Pellet heating boiler
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 39
2

TRANSPORT AND INSTALLATION

2.1 Conditions of supply, transport and storage

After the water and electrical connections have been prepared by a qualified technician, open the packing and
remove the boiler from the pallet.
Once protective packing has been removed, be very careful not to damage the electrical and mechanical parts by
bumping or splashing water.
The boiler is delivered wrapped in nylon protection and packed on a pallet + wooden crate after completing the
production cycle and the functional testing on the assembly line at the manufacturer's factory.
The boiler must be handled carefully, avoiding any bumping, always keeping it upright for transport and only using
forklifts; alternatively, it can be handled from the top using a strap connected to a strong and secure hooking located
internally and accessible by removing the two covers of the upper cladding and the cover as shown below, and
inserting the strap inside the rectangular tube.Make sure the equipment used for lifting and transport can take the
boiler's weight, specified on the data plate and in this manual.
Transport by
trolley
Boiler on
packing base
Removing
covers to fix the
lifting strap.
44
Unpacking the
boiler
Lifting by
means of chain
with hook.
Lifting by means of
strap with secure
hooking.
NATURFIRE 30-35-39 HR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Naturfire 35 hrNaturfire 39 hr

Table of Contents