Concentric Horizontal Kit Installation - Immergas VICTRIX 24 TT 1E Instruction And Warning Book

Hide thumbs Also See for VICTRIX 24 TT 1E:
Table of Contents

Advertisement

1.13 CONCENTRIC HORIZONTAL KIT
INSTALLATION.
Type C configuration, sealed chamber and
fan assisted.
Horizontal intake-exhaust kit Ø 60/100. Kit
assembly (Fig. 1-13): install the bend with flange
(2) on the central hole of the boiler, positioning
gasket (1) with the circular projections down-
wards in contact with the boiler flange, and
tighten using the screws present in the kit. Fit
the Ø 60/100 (3) concentric terminal pipe with
the male side (smooth) to the female side of the
bend (2) up to the end stop; making sure that the
internal and external wall sealing plate have been
fitted, this will ensure sealing and joining of the
elements making up the kit.
• Extensions for Ø 60/100 horizontal kit (Fig.
1-14). The kit with this configuration can be
extended up to a max. 12.9 horizontal m in-
cluding the terminal with grid and excluding
the concentric bend leaving the boiler. This
configuration corresponds to a resistance factor
of 100. In this case the special extensions must
be requested.
Immergas also provides a Ø 60/100 simplified
terminal, which in combination with its ex-
tension kits allows you to reach a maximum
extension of 11.9 metres.
• External grid. N.B.: for proper system opera-
tion the terminal with grid must be installed
correctly ensuring that, the "high" indication
on the terminal is observed during installation.
2
1
3
The kit includes:
N° 1 - Gasket (1)
N° 1 - Concentric bend Ø 60/100 (2)
N° 1 - Int./exhaust concentric terminal Ø 60/100 (3)
N° 1 - Internal wall sealing plate (4)
N° 1 - External wall sealing plate (5)
3
4
2
1
The adaptor kit includes:
N° 1 - Gasket (1)
N° 1 - Adaptor Ø 80/125 (2)
1-15
Horizontal intake-exhaust kit Ø 80/125. Kit
assembly (Fig. 1-15): to install the kit Ø 80/125
one must use the flanged adapter kit in order
to install the flue system Ø 80/125. Install the
flanged adaptor (2) on the central hole of the
boiler, positioning gasket (1) with the circular
projections downwards in contact with the boiler
flange, and tighten using the screws contained in
the kit. Engage the bend (3) with the male side
(smooth) to the end stop on the adapter (1). Fit
the Ø 80/125 (5) concentric terminal pipe with
the male side (smooth) to the female side of the
bend (4) (with lip seals) up to the end top; making
sure that the internal (6) and external wall sealing
plate (7) have been fitted, this will ensure sealing
and joining of the elements making up the kit.
• Extensions for horizontal kit Ø 80/125 (Fig.
1-16). The kit with this configuration can be
extended up to a max. length of 32 m, includ-
ing the terminal with grid and excluding the
concentric bend leaving the boiler. If addi-
tional components are assembled, the length
equivalent to the maximum allowed must be
subtracted. In this case the special extensions
must be requested.
C13
4
5
1-13
C13
5
6
The Kit Ø 80/125 includes:
N° 1 - Concentric bend Ø 80/125 a
87° (3)
N° 1 - Int./exhaust concentric termi-
nal Ø 80/125 (4)
N° 1 - Internal wall sealing plate (5)
N° 1 - External wall sealing plate (6)
The remaining kit components must
not be used
Max. 12790 mm
Max. 32000 mm
Max. 31956 mm
13
Max. 12900 mm
C13
1-14
C13
1-16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents