Table Of Contents; Introduction; Safety - Agilent Technologies Varian 320-MS Pre-Installation Instructions

Quadrupole mass spectrometer lc/ms
Hide thumbs Also See for Varian 320-MS:
Table of Contents

Advertisement

Contents
Introduction ................................................................... 2
Safety ...................................................................... 2
Before the Installation ................................................... 3
User Representative ................................................ 3
Entrance .................................................................. 3
Bench Space and Load ........................................... 3
Vibration .................................................................. 6
Temperature ............................................................ 7
Humidity ................................................................... 8
Particulate Matter .................................................... 8

Introduction

The Pre-installation Instructions are a guide for each requirement of the checklist. Follow these
instructions to ensure that the installation requires no more than the usual three days. Have the
completed checklist available to schedule the installation. After the Varian Representative
completes the installation, and it is accepted, samples can be analyzed.
After meeting all of these requirements, contact the Customer Service office in your
region to schedule the installation.
The LC/MS operates reliably under carefully controlled environmental conditions. You must
provide suitable power sources, operating environment, materials, and solvents. Failures may
occur if you use or maintain the system outside of the power and operating environment ranges
and limits described in these instructions. The Varian Warranty and Service contract specifically
excludes the repair of failures due to such causes.

Safety

Safety is the most important consideration for instrument use. Determine if the installation site
complies with all relevant safety regulations.
9300025700: Rev. A
All phases of preparing the installation site must conform to
local safety, electrical, and building codes. These codes take
CAUTION
precedence over any recommendations in these instructions.
The customer is responsible for compliance.
Check the checklist box: Installation site is in compliance with all relevant
safety regulations.
 
Power Requirements .............................................. 8
Installation Site Power .......................................... 10
 
 
Qualified Computer Equipment ............................. 11
Gas Requirements ................................................ 11
 
Materials and Solvents.......................................... 12
 
 
When the LC/MS Arrives ............................................ 13
Inspecting the Shipping Cartons ........................... 13
 
 
Unpacking and Installing ....................................... 14
Spare Parts ................................................................ 14
 
Preventive Maintenance ............................................. 14
 
2 of 14
Pre-installation Instructions
 
 
 
 
 
 
 
 
 
 

Advertisement

Table of Contents
loading

Table of Contents