RED COMPACT 14-2015 Installation Manual page 25

Pellet boiler
Table of Contents

Advertisement

4 - UNPACKING
To remove the front bracket (fig.3) proceed as follows:
open the door
remove screw "s"
remove screw "t"
lift and remove bracket "A"
s
Install the boiler in the area set aside for it, making sure it conforms to the requirements. The boiler body or unit must always be kept
in a vertical position when moved, and only ever moved using suitable lifting trolleys. Pay particular attention to the door and its glass,
protecting them from mechanical knocks that would compromise their integrity.
The product must always be moved with care. If possible, unwrap the boiler near the chosen place of installation. The packaging materials
are neither toxic nor harmful, and therefore no particular disposal measures are required.
The product, as indicated in figure 1 consists of a single packaged unit.
After removing all the packaging, check that the boiler is complete and not damaged. If in doubt, contact the retailer.
The following documents are provided in the package:
Plant booklet
Instruction booklet
Annex G - Technical test report for thermal plant of less than 35 kW.
Guarantee
Technical Dept. - All rights reserved - Reproduction is prohibited
t
A
Figure 3 - Front bracket
removal
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents