Accessories; Installation - CraftBot FLOWGENERATION FLOW Installation Manual

Table of Contents

Advertisement

2. ACCESSORIES

Below you can see contents of the box. First of all, check the list to make sure nothing is missing!
1.
Front cover (1x)
2.
Rear cover (1x)
3.
Screws (10x)
Tools needed: 2.5mm allen key
Installation time: 10 mins

3. INSTALLATION

Please follow the steps listed below to install the dome.
Remove the filament spool holder.
Remove the filament tube holder.
Remove the screws marked with an arrow on the top cover of the printer. (6x)
Place the rear cover to the printer. Please be sure, the cover sits properly on the printer's top cover.
FLOW / FLOW XL DOME
INSTALLATION MANUAL
www.craftbot.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FLOWGENERATION FLOW and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Flowgeneration flow xl dome

Table of Contents