Positioning The Rooftop On Roofcurb - Lennox eNeRGy Series Installation, Operating And Maintenance

High efficiency packaged air treatment unit
Table of Contents

Advertisement

INSTALLATION ON A ROOFCURB

Positioning the rooftop on roofcurb

IMPORTANT note: Prior to put the machine, make sure to put a polyethylene gasket on the
roofcurb upper flange side (must be delivered in the roofcurb package).
This gasket must be put only on the external perimeter of the roofcurb and around the supply and return
section
During the installation of the unit on the roofcurb, it's important to keep the unit in horizontal position or with the treatment box
slightly downwards. It will make the positioning of the return and the supply easier.
eNeRGy-IOM-2020.12-EN
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents