Connections - Lennox eNeRGy Series Installation, Operating And Maintenance

High efficiency packaged air treatment unit
Table of Contents

Advertisement

DELIVERY CHECKS
• Avoid installing two units side by side or close to each other as this may restrict the airflow to the condensers, and could limit
the access for maintenance purposes.
Before installing a packaged rooftop unit it is important to understand:
• The direction of prevailing winds
• The direction and position of air flows.
• The external dimensions of the unit and the dimensions of the supply and return air connections.
• The arrangement of the doors and the space required to open them to access the various components.

Connections

• Ensure that all the pipe-work crossing walls or roofs are secured, sealed and insulated.
• To avoid condensation problems, make sure that all pipes are insulated according to the temperatures of fluids and type of
rooms.
NOTE: The packaging protection fitted on the finned surfaces must be removed prior to start up.
eNeRGy-IOM-2020.12-EN
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents