Rating Plate - Lennox eNeRGy Series Installation, Operating And Maintenance

High efficiency packaged air treatment unit
Table of Contents

Advertisement

DELIVERY CHECKS
On receipt of new equipment please check the following points. It is the customer's responsibility to ensure that the products are
in good working order:
• The exterior has not been damaged in any way.
• The lifting and handling equipment are suitable for the equipment and comply with the specifications of the handling instructions
enclosed here-in.
• Accessories ordered for on-site installation have been delivered and are in good working order.
• The equipment supplied corresponds to the order and matches the delivery note.
If the product is damaged, exact details must be confirmed in writing by registered post to the shipping company within 48 hours
of delivery (working days). A copy of the letter must be addressed to LENNOX and the supplier or distributor for information
purposes. Failure to comply will invalidate any claim against the shipping company.

Rating plate

The rating plate provides a complete reference for the model and ensures that the
unit corresponds to the model ordered. It states the electrical power consumption
of the unit on start-up, its rated power and its supply voltage. The supply voltage
must not deviate beyond +/- 5 %. The start-up power is the maximum value likely
to be achieved for the specified operational voltage. The customer must have a
suitable electrical supply. It is therefore important to check whether the supply
voltage stated on the unit's rating plate is compatible with that of the mains
electrical supply.
The rating plate also states:
year of manufacture
weight of the unit
type of refrigerant used + GWP: Global warming potential
required charge for each circuit
operating Pressure min/max
operating Temperature min/max
CE marking : 7 possible cases
CE
-
-
CE1312
Absence of CE marking (outside the EC only)
-
Storage
When units are delivered on site they are not always required immediately and are sometimes put into storage. In the event of
medium to long-term storage, we recommend the following procedures:
• Ensure that there is no water in the hydraulic systems (for water condensing rooftops)
• Keep the heat exchanger protection if any.
• Keep protective plastic film in position.
• Ensure the electrical panels are closed.
• Keep all items and options supplied in a dry and clean place for future assembly before using the equipment.
• Store the unit on an appropriate place (flat surface).
Storage temperature must be respected according to the information given on the rating plate
It is strongly recommended to store units is a dry, sheltered place (in particular for units that will be installed indoor).
Maintenance access
With the new easy lock system integrated in eNeRGy, we can have different possibilities of panel opening, making more
easy maintenance operations.
Panels can be opened rightwards, leftwards and they can also be dismounted completely, by
removing all the lockers.
The lockers are equipped with a locking system (lock/unlock with a tool).
After commissioning, all the panels must be closed and locked.
After any maintenance operation, all the panels must be closed and locked.
eNeRGy-IOM-2020.12-EN
-CE0038 or CE0094
-CE0038 or CE0094+ CE1312
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents