4.6 MINIAIR unit positioning
The unit is equipped with anti-vibration support plates.
As follows are indications the various sequence of assembly:
1.
Carry out the drilling of the ceiling, and fit the four M8 threaded bolts as indicated in the diagram.
2.
Position the unit on the four bolts using the supplied fixing plates.
3.
Block the unit tightening the fixing bolts.
i. Dimensions
A
B
To aid the regular flow of the condensation, it is advised to install the unit with a 3mm inclination towards the
condensation outlet.
IOM / MINIAIR-0507
10
20
25
745
1105
1435
820
820
820
30
40
50
1435
1715
1820
820
820
922
60
2040
922
9