Siemens SIMPRO-100 Instruction Manual page 111

Motor protection relay
Table of Contents

Advertisement

SIMPRO-100
Applied Currents
and Voltages
PHROT = ABC
Ia = 2.5 A ∠-26°
Ib = 2.5 A ∠-146°
Ic = 2.5 A ∠94°
Va = 67 V ∠0°
Vb = 67 V ∠-120°
Vc = 67 V ∠120°
PHROT = ACB
Ia = 2.5 A ∠-26°
Ib = 2.5 A ∠94°
Ic = 2.5 A ∠-146°
Va = 67 V ∠0°
Vb = 67 V ∠120°
Vc = 67 V ∠-120°
Table 7.12 Power Measuring Accuracy Test Values, Wye Voltages
7.3.8.2
Accuracy Test, Delta Voltages
1. Connect the current sources to the IA, IB, and
IC current inputs (5 A or 1 A, as indicated by
the ITAP setting). Connect the voltage
sources to the voltage inputs in delta
configuration (refer to Figure 7.4, page 104).
2. Using the front-panel Set Relay\Relay
Elements\General Data function or serial port
SHOW command, note the CTR, PTR, and
PHROT settings.
PRIM-2400C
Real Power
(kW)
Expected:
P = 0.4523 • CTR • PTR
Measured:
Expected:
P = 0.4523 • CTR • PTR
Measured:
Reactive Power
(kVar)
Expected:
Q = 0.2211 • CTR • PTR
Measured:
Expected:
Q = 0.2211 • CTR • PTR
Measured:
3. Referring to Figure 7.4, page 104, set the
current and voltage source magnitudes. The
phase angles you should apply depend on the
PHROT setting. Use the front-panel Meter
Values\Instantaneous Meter function to verify
the relay measurements.
Commissioning
Power Factor
(pf)
Expected:
pf = 0.90 lag
Measured:
Expected:
pf = 0.90 lag
Measured:
7
109