Converter Operation In The Independent Poll Mode Of The Metering Devices - Vega Absolute M-BUS-2 User Manual

Hide thumbs Also See for M-BUS-2:
Table of Contents

Advertisement

2. OTAA. After pressing the start button, the device makes three attempts to connect to
the network within the set frequency plan. After the activation in the LoRaWAN network is
confirmed, the device sends a signal (LED flashing for 5 seconds) and switches to the "Active"
mode. If all attempts fail, the converter will continue to accumulate data and will attempt to
connect to the network every 6 hours.
To transfer the device from the "Active" mode to the "Storage" mode, you can use the
long press of the start button (more than 5 seconds).
Before connecting the device to the network, make sure that its registration
data is entered in the network - Device EUI, Application EUI and Application
Key for OTAA, or Device address, Application session key and Network
session key for ABP
CONVERTER OPERATION IN THE INDEPENDENT POLL MODE OF THE METERING
DEVICES
In the independent poll mode, the converter periodically and consistently polls the
metering devices at their secondary addresses. The addresses of the polling devices are writting
to the converter using the "Vega LoRaWAN Configurator" application. In case of a successful
poll, the data transferred by the metering device is accumulated in the configurator memory
12
M-BUS-2 / User Manual
Press the start
button located on
the board
Revision 09 - 06 July 2021

Advertisement

Table of Contents
loading

Table of Contents