Pipe Installation; Hard Water Areas; Cleaning The Heating System - Nibe VPB 500 UK Installation And Maintenance Instructions Manual

Hide thumbs Also See for VPB 500 UK:
Table of Contents

Advertisement

Pipe installation

Warning to the installer!
This installation is subject to building
regulation approval, notify the local
Authority of intention to install.
Pipe installation
Pipe installation must be carried out in accordance with
current norms and directives.
The total volume is 496 litres in the waterheater.
The pressure vessel is approved for max 6,0 bar (0,6
MPa) in the water heater and 3 bar (0,3 MPa) in the coil.
Discharge pipes from tundishes shall have an vertical
section of pipe at least 300 mm long, before any el-
bows or bends in the pipework. See following picture.
Copper inserts should be fitted when a plastic pipe or
annealed copper pipe is used.
A discharge pipe must be routed from the pessure relief
valve to a suitable drain. The size of the discharge pipe
must be the same as on the pessure relief valve. The
discharge pipe must be routed downwards to prevent
Metal discharge pipe from
temperature relief valve to tundish
Safety device
(e.g. temperature
600 mm maximum
relief valve)
300 mm
minimum
Matal discharge pipe from tundish,
with continous fall.
Table sizing of copper discharge pipe for common
temperature relief valve outlet sizes
Valve outlet size
G1 / 2
G1 / 2
G1 / 2
G3 / 4
G3 / 4
G3 / 4
G1
G1
G1
4 4 4
Tundish
Discharge below
fixed grating
Fixed grating
Trapped gulley
Possible wall
Minimum size of
Minimum size of
discharge pipe
discharge pipe from
15 mm
15 mm
15 mm
22 mm
22 mm
22 mm
28 mm
28 mm
28 mm
water pockets and must be frost proof. The outlet of
the discharge pipe should be visible and clearly away
from any electrical components.

Hard water areas

Usually, there should not be a problem in installing VPB
500 UK in areas of hard water as the operating tempe-
rature is 50-60 °C.

Cleaning the heating system

When the water heater and the heating system have
been filled with water, VPB 500 UK must operate at
maximum normal temperature for at least one hour.
Thereafter the system must be drained of water and
refilled.
Emptying the system by
1. Open the filling valve and the drain valve for the
heating system.
2. Flush the system for some minute. Watch out for
water splashes from the safety valve.
3. Close the valves and check the stainer.
Please note that the connection of the T&P-valve
should not be used for any other purpose.
No valve should be fitted between the expansion
valve and the storage cylinder.
Maximum resistan-
ce allowed, expres-
tundish
sed as a length
of straight pipe
(i.e. no elbows or
22 mm
28 mm
up to 18 m
35 mm
up to 27 m
28 mm
35 mm
up to 18 m
42 mm
up to 27 m
35 mm
42 mm
up to 18 m
54 mm
up to 27 m
VPB 500 UK
Resistance created
by each elbow or
bends)
up to 9 m
up to 9 m
up to 9 m
bend
0,8 m
1,0 m
1,4 m
1,0 m
1,4 m
1,7 m
1,4 m
1,7 m
2,3 m