1.0 INTRODUCTION Thank you for purchasing a Heatrae Sadia Streamline Oversink Vented Water Heater. The Streamline is manufactured in the UK to the highest standards and has been designed to meet all the latest relevant safety specifications. 1.1 IMPORTANT POINTS The Streamline must be installed and commissioned by a competent person.
WARNING: THE STREAMLINE IS AN OPEN OUTLET WATER HEATER. THE OUTLET OF THE STREAMLINE ACTS AS A VENT AND MUST ONLY BE CONNECTED TO HEATRAE SADIA VENTED TAPS OR SPOUTS. THESE FITTINGS MUST NEVER BE BLOCKED, RESTRICTED OR MODIFIED, IN ANY WAY.
Page 7
3.3 FIXING Mark the position of the Streamline and the position of the fixing bracket (see figure 2). Fix the wall bracket using the two larger fixing plugs and screws provided Remove the cover of the Streamline by removing the two screws from the bottom face and rotating the cover about the top edge.
Page 8
FIGURE 06 - PLUMBING DIAGRAM WATER HEATER INLET WATER SUPPLY FLOW SERVICE RESTRICTOR VALVE 3.5 SPOUT ASSEMBLY Fit the 1/2”BSP nut to the inner container boss. Remove the spout clamp. Fit the spout through the back plate and grommet. Re-fit the spout clamp (ensure the spout clamp ribs engage with the spout and hold it securely in place) Tighten the 1/2”...
Page 9
FIGURE 08: SPOUT FRONT SPOUT FRONT SPOUT BODY 3.6 ELECTRICAL WARNING: THIS APPLIANCE MUST BE EARTHED. IT IS SUITABLE FOR A.C. SUPPLY ONLY. ELECTRICAL INSTALLATION MUST BE CARRIED OUT BY A COMPETENT ELECTRICIAN AND BE IN ACCORDANCE WITH THE LATEST I.E.E. WIRING REGULATIONS.
4.0 COMMISSIONING DO NOT SWITCH ON THE ELECTRICAL SUPPLY UNTIL THE STREAMLINE HAS BEEN FILLED WITH WATER AND CHECKED FOR LEAKS. Check all water and electrical connections are tight. Check that the thermostat and cutout capillaries are located correctly in the element pockets.
FIGURE 11: CONTROL KNOB ASSEMBLY CONTROL KNOB INTERNAL RIB EXTENSION BRASS SPINDLE 5.0 EXPLANATION TO USER Following Installation and Commissioning of the water heater, the operation should be fully explained to the user. 5.1 HOT WATER Indicate the location of the water heater and identify the outlets to which it is connected.
Maintenance should be carried out by a competent person and any replacement parts used should be Heatrae Sadia ‘Streamline’ spare parts. Little maintenance is required, however in hard water areas the Streamline may require periodic descaling to ensure efficient operation.
Page 13
6.2 DESCALE THE STREAMLINE Drain the Streamline (see section 6.1). Undo the locknut (rotate the locknut anticlockwise until it is clear of the inner container) Remove the Element Plate Assembly (EPA) and gasket. Remove scale from the element and the inner container. Renew the gasket.
7.1 CUT OUT RESET Disconnect the electrical supply. Remove the front cover (see section 3). Depress the red button (see figure 14). Recommission the Streamline (see section 4). If the cut out continues to operate contact the Heatrae Sadia Service Team.
FIGURE 14 - OVER TEMPERATURE CUT OUT RESET 8.0 SPARE PARTS The following comprehensive list of spare parts is available for your Streamline water heater. Please refer to the rating label bottom face of the Streamline before ordering to ensure the correct spare part is obtained. DO NOT REPLACE WITH PARTS NOT RECOMMENDED BY HEATRAE SADIA.
The Streamline is not guaranteed against damage by frost or due to the build up of scale. Please note that if Heatrae Sadia personnel or agents are requested to descale the Streamline, this work will be chargeable. This guarantee does not affect the statutory rights of the consumer.