Honeywell FF-SB12 Series Installation Manual page 65

Safety light curtains
Table of Contents

Advertisement

Changing Internal Jumper Link Positions (receiver only)
1. Remove the receiver power supply module from the light curtain housing.
2. Observe and note the position of the jumper links (see Electrical Connections chapter).
3. To reconfigure the factory settings of a new FF-SB Series light curtain to the cycle start mode, carefully
remove the jumper links and plug them in the positions illustrated in figure 4-13.
4. Perform an operational test to ensure proper functional readiness.
Figure 4-11 Factory Setting Jumper Link Positions on Receiver Power Supply Board
Receiver Power
Supply Board
Jumpers
72
Relays
Jumpers
Filter
107062-12 EN FR26 GLO 501 Printed in France

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents