Installation - Ecosoft Robust Installation And Operation Manual

Reverse osmosis system
Table of Contents

Advertisement

Instruction manual for ECOSOFT Robust reverse osmosis system
— check that feed water meets requirements in p. 2.2**.
** If the water quality does not meet requirements, refer to a water treatment
specialist company for assistance selecting the appropriate product for normalizing
the offending constituents.
3) Before proceeding with the installation, ensure there is enough space for the
assembled system. If using pressure tank, provide room for it as well. In case of
shortage of space, pressure tank can be removed to the distance of connecting tube
length.
4) Install the reverse osmosis system in accordance with below procedure.

4.2. INSTALLATION

Caution! This product has been factory tested for leaks, and may contain residual
moisture.
Before installation of tubing, filters, and membranes, wash your hands with
antibacterial soap.
Ensure that the installation place is shielded from direct sunlight and removed from
heating appliances.
1
Remove the reverse osmosis system from and the box and check that all parts are
inside the bag. Do not open the bag before verifying. You will not be able to claim
missing parts if the bag is opened.
2
Shut off water supply in place of installation and open a water tap for 1 minute to
relieve pressure in the system. Then close the tap.
3
Tap feed adapter 4 into the cold water plumbing.
Install feed valve 5 into the feed adapter. To avoid
leaks use PTFE seal tape.
The adapter size fits the most common ½" pipe. If
your pipe is another size, install an appropriate
fitting piece.
4
Unscrew compression nut from the feed valve tube connection. Slip red tube
through the nut and connect it to the feed valve tube connection, then screw
This manual is the intellectual property of, and copyrighted by ECOSOFT SPC LLC. Copying and reprinting is forbidden. © 2015
| 11

Advertisement

Table of Contents
loading

Table of Contents