Advertisement

Quick Links

Instruction manual
Ecosoft RO System MO6500BWTSS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MO6500BWTSS and is the answer not in the manual?

Questions and answers

Summary of Contents for Ecosoft MO6500BWTSS

  • Page 1 Instruction manual Ecosoft RO System MO6500BWTSS...
  • Page 3: Table Of Contents

    8.1. Overview......................14 8.2. Input & output specifications................14 8.3. Operating modes..................... 15 8.4. Program settings....................18 A. Wiring diagram....................... 22 B. Pipe and instrument diagrams................24 This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 4: Acronyms And Abbreviations

    (membrane rinse) cycle, then switches to standby. The controller receives temperature and conductivity of permeate, permeate level, pressure switch statuses, and external inhibition signals. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 5: Technical Specifications

    230 V, 50 Hz 5…30 °C Electrical power water (1 phase) ***Some limitations may not apply if using antiscalant, oxygen scavenger, or other type of chemical pretreatment. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 6: Product Water Capacity Charts

    • 0 bar backpressure in the permeate line • variable permeate recovery (shown on the top) • 80% of the rated membrane flux See the following section for instructions on process setup. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 7: Installation And Startup

    Run power to the RO system. Connect the phase(s), neutral, and earth conductors as shown on the electrical diagram. Use a suitable ampacity circuit breaker in your distribution panel. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 8 EXAMPLE: Assume feed water TDS = 6 g/l, t = 15 °C. On Figure 2.1 MO6500BWTSS flow capacity chart the following approx. values will be found: Permeate flow rate = 300 l/h ≈ 5 l/min Recovery ≈ 55% = 0.55 Using the above formula, Target Drain Flow Rate = 300/0.55 - 300 = 245 l/h ≈...
  • Page 9: Installation Requirements

    Change polypropylene cartridge when it has clogged. Pressure drop of 0.1 MPa or greater on the sediment filter indicates that filter cartridge needs to be replaced as soon as possible. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 10 • install new membrane element, observing flow direction as indicated by the arrow; • fasten the caps and install the vessel back in place; • re-connect tubes back to the vessel. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 11: Shipping And Storage Requirements

    The RO machine in its original packaging can be shipped by all types of air, sea or ground transport. • During transportation, the unit must be protected from exposure to low temperatures and jolts/vibration. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 12: Troubleshooting

    Clogged prefilter Check the filter cartridge and replace if necessary. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 13 Membrane fouling or Replace the membrane or carry out chemical cleaning scaling Other issue / unclear Other Contact your vendor’s customer support possible cause This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 14: Controller

    Flush electric valve Valve_Rinse 20 (open) 19 (ground) 18 (neutral) Bypass electric valve Valve_Bypass 17 (open) 16 (ground) For more detail, please see the wiring diagram. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 15: Operating Modes

    1.5, 1.6. It is also activated in Service mode if the controller is going to transition to Standby after reading high tank level or high permeate pressure. It can be manually activated while in Service by pushing START button. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 16 Status of outputs in STANDBY Booster and antiscalant pumps Entry valve closed Forward flush valve closed Bypass valve closed Alarm This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 17 Forward flush valve closed Bypass valve closed Alarm Upon pushing START or deactivating stop switch, the controller will resume from where it was interrupted. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 18: Program Settings

    *During the first run of the R.O. unit, the parameter can be increased to the maximum value in order to vent the air and fill the system with water. Make sure to revert it back to the factory setting of 10 sec. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 19 (0…255 seconds). The pump will continue to run for this many seconds before Fault mode is switched to. If set to 0, pump will stop running immediately after low feed pressure occurs. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 20 Step 1.17 is displayed only if step 1.16 is set to non-zero value. 1.18 Display temperature Select units of temperature (C for Celsius, F for Fahrenheit). 1.19 New settings and calibration passcode Verify passcode. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 21 This setting will not be shown if the scheduled stop is turned off in step 3.1. 3.3 New Maintenance passcode Enter new passcode for Maintenance submenu and confirm. This will exit the Configuration menu. This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 22: Wiring Diagram

    17: 0,75 mm² brown 08: 2 × 0,75 mm² 18: 0,75 mm² blue 09: 2 × 0,75 mm² 10: 3 × 0,75 mm² less ground This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 23 SUCO PS1/1 0164-42141-3-070 PS1/2 VENT201404 low feed pressure switch Forward Flush Valve EV1/1 Entry SUCO PS2/1 Solenoid 0164-41341-3-013 EV1/2 PS2/2 Valve high pressure switch EV1/G This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 24: Pipe And Instrument Diagrams

    G ½″ FH-01 Grundfos CRN 1-36 filter housing PJE DN32 G 1″ PIPES VALVES Stainless steel pipe DN15 Solenoid Valve Needle Valve Motorized Valve Check Valve This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 25 Pressure gauge Pressure gauge Rotameter Rotameter (process mount) (process mount) Pressure switch Pressure switch Conductivity probe Conductivity probe (process mount) (process mount) (process mount) (process mount) This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 26 G ½″ FH-01 Grundfos CRN 1-36 filter housing PJE DN32 G 1″ PIPES VALVES Stainless steel pipe DN15 Solenoid Valve Needle Valve Motorized Valve Check Valve This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...
  • Page 27 Pressure gauge Pressure gauge Rotameter Rotameter (process mount) (process mount) Pressure switch Pressure switch Conductivity probe Conductivity probe (process mount) (process mount) (process mount) (process mount) This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2021...

This manual is also suitable for:

Mo12000bwtss

Table of Contents