2.6 Connection of water pipes
During installation the actual pressure and pressure losses
must be taken into account regarding pipe dimensions to
assure sufficient pressure and water flow rates.
The plumbing must be carried out according to regulations.
The piping can be made of flexible or solid materials. Care
must be taken in respect to corrosion to avoid damages.
As for all pressurerized containers the heat pump must also
be equipped with safety and check valves on the supply
side.
Cold water inlet and hot water outlet is located under the
tank (3/4" thread connectors).
The maximum working pressure is 10 bars, and the
maximum working temperature is 65°C.
If necessary, the supply pipe must be equipped with a
pressure reduction valve and eventually a filter.
When installing the pipe work in the house any dirt in the
pipes must be avoided. (Eventually flush the pipes with
clean water before the heat pump is installed)!
When the pipes are connected make sure the pipes are not
twisted. Use tools to hold the pipes against twisting!
If no recirculation is needed make sure the recirculation
connector is closed!
Water connection
Under the heat pump the connections are located:
Condenswater drain hose
Cold water inlet / Recirculation / Hot water outlet
No holes may be drilled. It cut damage the
winded condenser
1. Screws to be removed (hexagonal head).
2. Screws to be removed
3. Removal of screws
- Technishce Änderungen vorbehalten -