Genvex GE 315 VP Installation Manual

Genvex GE 315 VP Installation Manual

Activ ventilation heating pump

Advertisement

Installations Manual
.
Activ Ventilation
Heating pump
.
GE 315 VP (C)
.
GE 420 VP (C)
.
GE 525 VP (C)
.
GE 630 VP (C)
.
GE 840 VP (C)
Version 1,0 / 1206

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GE 315 VP and is the answer not in the manual?

Questions and answers

Summary of Contents for Genvex GE 315 VP

  • Page 1 Installations Manual Activ Ventilation Heating pump GE 315 VP (C) GE 420 VP (C) GE 525 VP (C) GE 630 VP (C) GE 840 VP (C) Version 1,0 / 1206...
  • Page 2: Table Of Contents

    Table of contents Aufstellung ..............4 Duct connection ............5 Duct system ..............5 Condensate drain ............6 Insulation of ducts in cold loft spaces ......6 Insulation of ducts in heated spaces......7 Electrical installation.............7 Optimum initial adjustment of plant ......8 Maintenance of plant .............8 Fault finding ..............10 Electrical diagram GE 315-630VP/VPC ......11 Electrical diagram GE 840VP/VPC ......12...
  • Page 3 3) The water trap hight must be at least 100 4) Make sure that the drain flows downwards all This instruction must be followed. If the drain is not made according to this instruction, GENVEX the way from the unit. A/S can not be made responsible for any additio-...
  • Page 4: Aufstellung

    Installation Dimensions in mm Installation The GE 315 VP(C) to GE 840 VP(C) is available with supply air on the right-hand side (as shown) or supply air ø on the left-hand side AND as a heat exchanger (VP) or as a reversible cool/heat exchanger.
  • Page 5: Duct Connection

    In flats/houses where it is not possible to provide a sufficient distance between the fresh air and the escaping, a Genvex airbox may be used. - Subject to Technical Modifications -...
  • Page 6: Condensate Drain

    Installation Condensate drain The units produce up to 10 litres of condensate per day. It Fresh air Extract air is therefore important that the condensate drain is correctly executed and that the unit has a slight fall towards the condensate drain. The condensate drain pipe must be Exhaust air Supply air mounted with the necessary fall and be led to an internal...
  • Page 7: Insulation Of Ducts In Heated Spaces

    To start up the unit before adjustment, do as follows: Before starting up the unit: 1: Check that the Genvex unit is correctly mounted and that all ducts are insulated as required. 2: Check that hatches can be opened so that service and maintenance on the unit can be carried out.
  • Page 8: Optimum Initial Adjustment Of Plant

    Installation Optimum initial adjustment of plant Air measuring equipment is used. Before starting initial adjustment, check that the 5 points in the inspection and initial adjustment section have been carried out. Then start up the unit: Set the initial basic ventilation value, which is speed 2. To reduce energy consumption as much as possible, first adjust the main air volumes to the desired air volume by changing the voltage outlet on the transformer.
  • Page 9 Service If you are unable to maintain your unit yourself, you 100 mm can sign a service agreement with the Genvex service department. If any faults arise in the unit, contact the Genvex service department. - Subject to Technical Modifications -...
  • Page 10: Fault Finding

    Installation Fault finding Unit has stopped: The display shows: No light in any of the lamps on the control panel, even though both buttons are pressed. Data error: Error: - no communication between the display and controller.  Fuse on electric panel has blown, no power to unit - cable between display and circuit board to long ...
  • Page 11: Electrical Diagram Ge 315-630Vp/Vpc

    Electric Diagram Electric Diagram GE 315-630 VP(C) - Subject to Technical Modifications -...
  • Page 12: Electrical Diagram Ge 840Vp/Vpc

    Electric Diagram GE 840 VP(C) - Subject to Technical Modifications -...
  • Page 13 Electric Diagram GE 840 VP(C) - Subject to Technical Modifications -...
  • Page 14: Eu-Declaration Of Conformity

    EU-Declaration of conformity - Subject to Technical Modifications -...
  • Page 15 - Subject to Technical Modifications -...
  • Page 16 Tel.: + 43 (0) 463 / 3 27 69 Tel.: (UK 028) (ROI 048) +44 2076 8708 Fax: +43 (0) 463 / 3 75 48 Fax: (UK 028) (ROI 048) +44 2076 9781 E-Mail: office@pichlerluft.at E-Mail: info@ecosystemsireland.com Technische Angaben ohne Gewähr © Genvex www.genvex.dk...

Table of Contents