Preparation For Operation - Omron SYSMAC CPM2B Operation Manual

Programmable controller
Hide thumbs Also See for SYSMAC CPM2B:
Table of Contents

Advertisement

Using a Programming Console
Panel Installation

6-1-4 Preparation for Operation

!
Caution
1, 2, 3...
82
The C200H-PRO27-E Programming Console can be installed in a control panel
as shown in the following diagram. (The C200H-ATT01 Mounting Bracket is sold
separately.)
Mounting Bracket
Panel thickness: 1.0 to 3.2 mm
Allow at least 80 mm for the cable connector above the Programming Console.
37
This section describes the procedures required to begin Programming Console
operation when using the Programming Console for the first time.
Always confirm that the Programming Console is in PROGRAM mode when
turning ON the PC with a Programming Console connected unless another
mode is desired for a specific purpose. If the Programming Console is in RUN
mode when PC power is turned ON, any program in Program Memory will be
executed, possibly causing a PC-controlled system to begin operation.
The following sequence of operations must be performed before beginning ini-
tial program input.
1. Be sure that the PC is OFF.
2. Connect the Programming Console to the CPU Board's peripheral port. See
6-1-3 Connecting the Programming Console for details.
(The CPU Board's Communications Switch setting has no effect on commu-
nications with the Programming Console.)
3. Set the mode switch to PROGRAM mode.
4. Turn ON the PC.
5. Enter the password. See 6-1-5 Entering the Password for details.
6. Clear (All Clear) the PC's memory. See 6-2-2 Clearing Memory for details.
7. Read and clear all errors and messages. See 6-2-3 Reading/Clearing Error
Messages for details.
Mounting hole dimensions
(DIN43700 standards)
Two screws
15
At least 80 mm is required.
Either connector may
be used.
About 70 mm is required.
Section
6-1
+1.1
186
–0
+0.8
92
–0

Advertisement

Table of Contents
loading

Table of Contents