Verify operation

3.1
Power-up sequence
Upon applying power to the Field link the LCD display meter will activate and
display a series of startup screen. The following screens are displayed during
startup.
1. Startup Screen 1 – All segments on
2. Startup Screen 2 – Device identification
3. Startup Screen 3 – Tag
4. Startup Screen 4 – Status
3.2
Normal operation
After the initial startup screens the Field Link will cycle through several
periodic screens.
1. Electronics Temperature Screen
2. Percent Range Screen
3. Wired Interface Usage
4. Radio Interface Usage
The Field Link will continue to rotate through each periodic screen through
the course of normal operation. If any diagnostic or fault condition occurs, a
corresponding diagnostics screen will appear.
8
September 2020
Emerson.com/Rosemount