Step No.
3-a
3-b
3-a
3-b
4.
Repeat Step
13.9.5.2
Completing the test
Continue to test another function or end the test by changing the TestMode setting to Off. Restore
connections and settings to their original values, if they were changed for testing purposes.
13.9.6
Delta supervision of real input DELSPVC
Prepare the IED for verification of settings outlined in Section
13.9.6.1
Verifying the signals and settings
Make sure that the function is connected to any of the available real derived outputs, for example the
P output signal of the CMMXU function.
1.
Set the following parameters:
2.
Set a constant voltage input of UL1 = 63.5 V at 0° and UL2 = 63.5 V at 180° secondary and a
current signal at IL1 = 1A at 0° and IL2 = 1A at 180°.
3.
Ensure that the P output of CMMXU function has exceeded 10 MW and remains stable.
4.
Change the current signal at IL1= 2A at 0° and IL2= 2A at 180°. Both START and STARTRISE
signals should be active for 100 ms.
5.
Change the current signal at IL1= 1A at 0° and IL2= 1A at 180°. Both START and STARTLOW
signals should be active for 100 ms.
13.9.6.2
Completing the test
Continue to test another function or end the test by changing the TestMode setting to Off. Restore
connections and settings to their original values, if they were changed for testing purposes.
Generator protection REG670
Commissioning manual
OpMode
Changes after step 2
Instantaneous 1
cycle or
Instantaneous 2
cycle
Instantaneous 1
cycle or
Instantaneous 2
cycle
RMS or DFT Mag
RMS or DFT Mag
3
with IL2 changes for different mode.
Operation = ON
MinStVal = 10
DelSt> = 100
DeltaT = 7
tHold = 100
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Change IL1 to 2 A
Change IL1 back to 1A
Change IL1 to 2 A
Change IL1 back to 1A
Testing functionality by secondary injection
Expected output
STL1 , STRISE, START signal should be
TRUE for 100 ms
STL1 , STLOW, START signal should be
TRUE for 100 ms
STL1, STRISE, START signal should be
TRUE for 100 ms
STL1 , STLOW, START signal should be
TRUE for 100 ms
GUID-2FE5E5F0-0E6C-499E-93D2-471C183B89BF v2
GUID-86ADAAC5-B6D3-46FE-A090-81F7C90A31A7 v1
"Preparing the IED to verify
GUID-8337C76B-A361-426E-B936-763105D85588 v1
GUID-2FE5E5F0-0E6C-499E-93D2-471C183B89BF v2
Section 13
settings".
219

Advertisement

Table of Contents
loading

Table of Contents