Installation Position; Installation With Flanged Connection - GEM 533 eSyStep Operating Instructions Manual

Motorized globe valve
Table of Contents

Advertisement

NOTICE
Tools
▶ The tools required for installation and assembly are not
included in the scope of delivery.
Use appropriate, functional and safe tools.
1. Ensure the product is suitable for the relevant application.
2. Check the technical data of the product and the materials.
3. Keep appropriate tools ready.
4. Wear appropriate protective gear, as specified in the plant
operator's guidelines.
5. Observe appropriate regulations for connections.
6. Have installation work carried out by trained personnel.
7. Shut off plant or plant component.
8. Secure plant or plant component against recommission-
ing.
9. Depressurize the plant or plant component.
10. Completely drain the plant (or plant component) and let it
cool down until the temperature is below the media va-
porization temperature and cannot cause scalding.
11. Correctly decontaminate, rinse and ventilate the plant or
plant component.
12. Lay piping so that the product is protected against trans-
verse and bending forces, and also from vibrations and
tension.
13. Only install the product between matching aligned pipes
(see chapters below).
14. Please note the flow direction.
15. Please note the installation position (see chapter "Install-
ation position").

10.2 Installation position

The installation position of the product is optional.

10.3 Installation with flanged connection

Fig. 1: Flanged connection
NOTICE
Sealing material
▶ The sealing material is not included in the scope of deliv-
ery.
Only use appropriate sealing material.
www.gemu-group.com
Connector elements
▶ The connector elements are not included in the scope of
delivery.
Only use connector elements made of approved materi-
als.
Observe permissible tightening torque of the bolts.
1. Keep sealing material ready.
2. Carry out preparations for installation (see chapter "Pre-
parations for installation").
3. Ensure clean, undamaged sealing surfaces on the con-
nection flanges.
4. Align flanges carefully before installing them.
5. Clamp the product centrally between the piping with
flanges.
6. Centre the gaskets.
7. Connect the valve flange and the piping flange using ap-
propriate sealing materials and matching bolting.
8. Use all flange holes.
9. Tighten the bolts diagonally.
10. Re-attach or reactivate all safety and protective devices.
17 / 52
10 Installation in piping
NOTICE
GEMÜ 533
Positioner (Code S0)

Advertisement

Table of Contents
loading

This manual is also suitable for:

S0

Table of Contents