Manufacturer's Information; Delivery; Packaging; Transport - GEM 543 eSyStep Operating Instructions Manual

Motorized angle seat globe valve
Table of Contents

Advertisement

9 Manufacturer's information

9 Manufacturer's information

9.1 Delivery

● Check that all parts are present and check for any dam-
age immediately upon receipt.
The product's performance is tested at the factory. The
scope of delivery is apparent from the dispatch documents
and the design from the order number.

9.2 Packaging

The product is packaged in a cardboard box which can be re-
cycled as paper.

9.3 Transport

1. Only transport the product by suitable means. Do not
drop. Handle carefully.
2. After the installation dispose of transport packaging ma-
terial according to relevant local or national disposal reg-
ulations / environmental protection laws.

9.4 Storage

1. Store the product free from dust and moisture in its ori-
ginal packaging.
2. Avoid UV rays and direct sunlight.
3. Do not exceed the maximum storage temperature (see
chapter "Technical data").
4. Do not store solvents, chemicals, acids, fuels or similar
fluids in the same room as GEMÜ products and their
spare parts.

10 Installation in piping

10.1 Preparing for installation

WARNING
The equipment is subject to pressure!
▶ Risk of severe injury or death.
Depressurize the plant.
Completely drain the plant.
WARNING
Corrosive chemicals!
▶ Risk of caustic burns.
Wear suitable protective gear.
Completely drain the plant.
CAUTION
Hot plant components!
▶ Risk of burns.
Only work on plant that has cooled
down.
GEMÜ 543 eSyStep
Positioner (Code S0)
Exceeding the maximum permissible pressure.
▶ Damage to the GEMÜ product.
Provide precautionary measures against exceeding the
maximum permitted pressures caused by pressure
surges (water hammer).
Use as step.
▶ Damage to the product.
▶ Risk of slipping-off.
Choose the installation location so that the product can-
not be used as a foothold.
Do not use the product as a step or a foothold.
Suitability of the product!
▶ The product must be appropriate for the piping system
operating conditions (medium, medium concentration,
temperature and pressure) and the prevailing ambient
conditions.
Tools
▶ The tools required for installation and assembly are not
included in the scope of delivery.
Use appropriate, functional and safe tools.
1. Ensure the product is suitable for the relevant application.
2. Check the technical data of the product and the materials.
3. Keep appropriate tools ready.
4. Wear appropriate protective gear, as specified in the plant
operator's guidelines.
5. Observe appropriate regulations for connections.
6. Have installation work carried out by trained personnel.
7. Shut off plant or plant component.
8. Secure plant or plant component against recommission-
ing.
9. Depressurize the plant or plant component.
10. Completely drain the plant (or plant component) and let it
cool down until the temperature is below the media va-
porization temperature and cannot cause scalding.
11. Correctly decontaminate, rinse and ventilate the plant or
plant component.
12. Lay piping so that the product is protected against trans-
verse and bending forces, and also from vibrations and
tension.
13. Only install the product between matching aligned pipes
(see chapters below).
14. Please note the flow direction.
15. Please note the installation position (see chapter "Install-
ation position").

10.2 Installation position

GEMÜ recommend installing the actuator vertically upright or
vertically down to optimise the service life.
28 / 69
CAUTION
CAUTION
NOTICE
NOTICE
www.gemu-group.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Esystep 543

Table of Contents