5. INSTALLATION PROCEDURE
Step 4: Connect the power adapter to the Dynamic
Power Management module. One of the two power
adapter wires has a broken white stripe. This wire is the
power adapter GND and should therefore be connected
to the GND pin (right) on the module. The other wire is
the +5 Volts and should be connected to the +5V pin
(left) on the module. The middle pin is not used;
Step 5: Plug the power adapter of the Dynamic Power
Management Module into a power outlet. The PWR LED
must light up;
Step 6: The CS LED will (after a few seconds) indicate a
measured current after the power is on;
Step 7: Clamp a RJ12 connector straight to the UTP
cable for Dynamic Power Management;
Step 8: Feed the UTP cable(s) through the rubber stop(s)
on the data cable inlet of the charge point, as indicated
in section '3.4.1 Overview of Connections';
Step 9: Clamp a RJ12 connector straight to the UTP
cable for Dynamic Power Management;
Step 10: Check if the RJ12 connectors are OKAY with a
network cable tester;
Step 11: Plug the RJ12 cable in the black P1 dongle,
which is included in the box. Plug the P1 dongle in the
Dynamic Power Management module.
Step 12: Connect it to the P1 port, as indicated in the
'3.4.3 Overview Installing Accessories' section;
If both ends of the UTP cable are properly connected to
the charge point & Dynamic Power Management module
and powered, the P1 LED will indicate whether the
connection is correct. If the P1 LED does not show any
signal, please check if the RJ12 connectors are properly
connected using a network cable tester. If the led of the
P1 port of the charge point is blue, the Load Shedding
is functioning. If it is red, the P1 dongle is forgotten. If
there is no led on the P1 port, the cable is not correctly
connected.
5.5 CHARGE POINT CONFIGURATION
Charge point configuration should be done before the
charge point is powered on. To configure charge point
features such as Dynamic Power Management, please
follow the instructions as described in chapter 6 of this
installation manual.
INSTALLATIEHANDLEIDING – P14
INSTRUCTION MANUAL – P14 | P14
5.6 FINISHING UP (CLOSE
ENCLOSURE)
Step 1: Check and make sure that the rubber seal
around the casing is properly in place on the edge;
Step 2: Place the cover on the charge point;
Step 3: Hand-tighten the four M4 x 12 mm bolts
provided around the socket so that the cover closes on
the rubber seal but the rubber seal does not deform;
Step 4: Hand-tighten the other two M4 x 12 mm bolts
provided in the bottom of the cover;
Step 5: Turn the socket lid clockwise in the cover and
hand-tighten the M4 x 20 mm bolt provided;
Step 6: Switch on power to the charge point;
Step 7: Wait until charge point is fully started up (+/-10
minutes, LED should be off).
VERSION 0129NM02INT01
06A2NM20ENG05

Advertisement

Table of Contents
loading

This manual is also suitable for:

Newmotion home basic edition 22

Table of Contents