3. PRODUCT OVERVIEW
3.4.2
OVERVIEW OF CONNECTIONS | 22 KW VERSION
Cable clamp
Power cable inlet
If connecting to a 3-phase grid without neutral; only install 1-phase and connect one of the two other phase
wires in the neutral wire connection on the terminal block.
INSTALLATIEHANDLEIDING – P10
INSTRUCTION MANUAL – P10 | P10
VERSION 0129NM02INT01
06A2NM20ENG05
Power cable connections
Phase 1
Phase 2
Phase 3
Neutral
Earth
Tension relief
data cable
Earthing pole
connection
Earthing