Qualification Of Personnel; Inspection Before Use; Damage Due To Shipment; Power Requirements - Ametek 200 Series Quick Start Manual And Safety Instructions

Automotive transient immunity test generators
Table of Contents

Advertisement

AMETEK CTS
Only approved accessories, connectors, adapters, etc. are to be used to ensure safe operation.
1.5.

Qualification of personnel

The generator must be operated only by authorized and trained specialists with detailed knowledge of the
international, national or manufacturer's test standard.
1.6.

Inspection before Use

1.6.1.

Damage due to Shipment

The instrument was tested before shipment and was packed carefully on a transport palette. Each box is marked
with a detailed list of the contents.
Before activating the equipment, check for damage which may have occurred during shipment. Check each
container as well as the generator itself. In case of physical damage, contact the manufacturer before operating
the unit.
Figure 1 - Rack shipment
1.7.

Power requirements

Prior to turning the equipment on, check that the selected voltage corresponds to the supply voltage.
The position of the voltage selector must correspond with the
mains. If you change the mains voltage, replace the fuses
according the recommended value on the number plate.
Figure 2 - System shipment
Figure 3 - Single equipment shipment
1.00
Automotive Transient Immunity Testing
Figure 4 - Power Requirements
6 / 26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents