Bosch Rexroth BS 2/C Series Assembly Instructions Manual page 53

Belt sections
Hide thumbs Also See for Rexroth BS 2/C Series:
Table of Contents

Advertisement

7.
With the disassembly
3
tool
) remove enough
chain links to be able
to close the chain
as tightly as possible
at the tension wheel.
3
) Disassembly tool:
– For the accumulation
roller chain:
3 842 010 511
– For Vplus accumulation
roller chain:
3 842 539 357
Note:
• Remove the same number
of chain links from both
chains.
• Note the number of chain
links removed in the
service plan.
• Exchange the chain
if the admissible
elongation of the chain
(= 3% of the original
length) is exceeded.
8.
Close the chain.
9.
Release the chain
tensioner.
Check the tension
of the chain.
10.
Mount the bottom cover
sheets and the side
cover plates.
11.
Mount the external
housing element halves.
12.
Mount the gear motor.
BS 2/R-H
8
3 842 530 417
BS 2/R-V
8
3 842 538 872
Fig. 35:
Shortening the conveyor chain BS 2/R-H, reversible, BS 2/R-V, reversible (2/2)
Maintenance and Repair
12
SW10
M
= 8 Nm
D
9
3
11
7
8 981 010 511
3 842 539 537
3 842 358 724/2013-04, MIT: BS 2/C-... + BS 2/R-..., Bosch Rexroth AG
53/76
"X"
9
10
4x
SW4
M
= 7 Nm
D
547 601-59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents