1.
Wrap both ends of strapping around product.
2. Sandwich strapping with the bottom strap facing
towards you. (See Figure 1)
Figure 1
3. Squeeze handle towards base and insert strapping
under the gripper.
4. Pull strapping as close to product as possible to
reduce amount of tensioning that will be necessary

TENSIONING

1.
Move handle back and forth to begin tensioning
2. Continue back and forth motion until strapping has
reached desired tension. (See Figure 2)
Figure 2
PAGE 1 OF 3
1-800-295-5510
uline.com
INSTRUCTIONS

SEALING

1.
Place the seal. Seal should be placed open side
down on top of both pieces of strapping. (See Figure 3)
Figure 3
2. Close nose of sealer around seal.
3. Crimp tightly around strapping.
4. Repositioning the tightening handle:
• If handle is in forward position you will need to push
Handle Pawl forward and allow handle to fall to the
base (this allows you to remove the tensioner when
finished or to realign strapping during tensioning)
5. Remove excess strapping:
• When finished, cut excess strapping with a strapping
cutter.

MAINTENANCE

Tools do need to be cleaned and maintained
periodically with a steel brush or dry compressed air.
Lubricate all moving parts with light machine oil.
Para Español, vea página 2.
Pour le français, consulter la page 3.
Seal
0521 IH-242

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the H-242 and is the answer not in the manual?

Questions and answers

Baltazar cardenas
April 29, 2025

How to adjust the gap for the stapping

User image 68114d372e8a0
1 comments:
Mr. Anderson
May 15, 2025

To adjust the gap for the strapping on the U-Line H-242, pull the strapping as close to the product as possible before tensioning. This reduces the amount of tensioning needed. Then, if the tightening handle is in the forward position, push the handle pawl forward and let the handle fall to the base. This allows you to remove the tensioner or realign the strapping during tensioning.

This answer is automatically generated

Summary of Contents for U-Line H-242

  • Page 1 Para Español, vea página 2. Pour le français, consulter la page 3. H-242 1-800-295-5510 uline.com INDUSTRIAL STEEL TENSIONER INSTRUCTIONS THREADING TENSIONER SEALING Wrap both ends of strapping around product. Place the seal. Seal should be placed open side down on top of both pieces of strapping. (See Figure 3) 2.
  • Page 2 H-242 800-295-5510 uline.mx TENSIONADORA INDUSTRIAL DE ACERO INSTRUCCIONES COLOQUE FLEJE EN TENSIONADORA SELLE Envuelva ambos extremos del fleje alrededor del 1. Coloque el sello. El sello debe colocarse con el producto. lado abierto hacia abajo encima de ambos trozos de fleje. (Vea Diagrama 3) 2.
  • Page 3 H-242 1-800-295-5510 uline.ca TENDEUR INDUSTRIEL EN ACIER INSTRUCTIONS ENFILAGE DU TENDEUR SCELLEMENT Entourez le produit avec les deux extrémités du Placez le joint. Celui-ci doit être placé sur le dessus feuillard de cerclage. des deux morceaux du feuillard, côté ouvert vers le bas.

Table of Contents