Danfoss VLT AutomationDrive EZ FC 321 Installation Manual page 22

Hide thumbs Also See for VLT AutomationDrive EZ FC 321:
Table of Contents

Advertisement

VLT®AutomationDrive EZ FC 321
Installation Guide
3.
Connect the ground wire to the nearest grounding terminal.
4.
Connect the 3-phase motor wiring to terminals 96 (U), 97 (V), and 98 (W).
5.
Torque-tighten the terminals, see
Example
Mains input, motor, and grounding for basic drives. Actual configurations vary with unit types and optional equipment.
Danfoss A/S © 2021.05
Table
3.
Electrical Installation
AN354546796134en-000201 / 130R0954 | 21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VLT AutomationDrive EZ FC 321 and is the answer not in the manual?

Questions and answers

Table of Contents