Installation Check-Up - Faema E61 Legend Use And Installation

Hide thumbs Also See for E61 Legend:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25

5. Installation Check-up

WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.
HOT WATER
Continuously dispense hot water (pressing the appropriate button) until at least 4 liters of water have been used for
a machine with 1 group, 6 liters of water have been used for a machine with 2 groups, and 9 liters for a machine with
3 groups (see the "Hot water dispensing" chapter in the User's Manual).
STEAM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
6 EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E61 3 grE61 2 grE61 1 gr

Table of Contents