Installation Check-Up - Faema X20 Quick Start Manual

Table of Contents

Advertisement

Available languages

Available languages

5. Installation Check-up

WARNING: AFTER INSTALLATION, CHECK IF THE MACHINE IS WORKING PROPERLY (see Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE,
BEFORE ALLOWING THE WORKER TO START USING THE MACHINE, WASH THE
INTERNAL COMPONENTS ACCORDING TO THE INSTRUCTIONS BELOW:
COFFEE CIRCUIT
Press the coffee circuit quick wash icon
HOT WATER
Continuously dispense hot water (using the appropriate button) until at least 0.5 litres of water
have been used.
STEAM (where present)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
MILK CIRCUIT (where present)
Press the milk circuit wash icon
SOLUBLES CIRCUIT (where present)
Press the soluble circuit wash icon
OPERATION
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-levelling device is working
properly.
The expansion valves are working properly
.
and proceed as indicated on the display.
.
7 EN
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

X20 s10

Table of Contents