Power On And Setting Cpu Switches; Figure 5-2 Power Supply Switch Positions And Cpu Module Switch Settings - Hitachi S10mini CPU LINK Hardware Manual

Table of Contents

Advertisement

5 SETUP AND OPERATIONS

5.3 Power On and Setting CPU Switches

Turn on the power supply module's power switch and set the CPU switches. Either action may
come first.
(1) Power on
With the power supply module cover open, set the POWER switch to ON to turn on the power.
(2) Setting the CPU module switches
Set the following CPU module switches to the positions shown below:
• LADDER switch: STOP
• MODE switch: NORM or SIMU
• PROTECT switch: ON or OFF
For the switch positions, see Figure 5-2, which illustrates the case of using an LQV000 as a
power supply module and an LQP000 as a CPU module. If any other module is used, the
switch indications, such as the module type, differ from those shown in Figure 5-2, but the
switch positions and operation procedures are identical.
Power supply module
(with the cover open)
LQV000
POWER

Figure 5-2 Power Supply Switch Positions and CPU Module Switch Settings

PS
POWER
DC5V
SERVICE
CHECK
GND
ON
OFF
CPU module
LQP000
HITACHI
S10mini
5-4
CPU-S
LADDER
STOP
RUN
MODE
NORM
SIMU
PROTECT
ON
OFF
RESET

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lqe050Lqe050-z

Table of Contents