Download Print this page

IMER Mortarman 750 MBP Manual page 5

Advertisement

LIFTING THE MACHINE TO THE
MAXIMUMUNLOADING HEIGHT
CAUTION : Make sure the lift jack is on a solid flat surface
before beginning to raise the machine. Additionally, NEVER
work on or around the Mortarman
750 MBP while the jack
®
stand is holding it up........Serious injury can result!
1) Extract the lifting foot [1] (fig. 1) from the lateral housing.
2) Position the lifting foot in front of the drive hole [2] located on the engine side of the machine (front), and lower
the foot [1] until pin [3] is aligned with hole [2], by means of the handwheel [4].
3) Insert pin [3] in the drive hole [2] and turn handwheel [4] to raise the machine until the front legs [F] are
detached from the ground.
4) Remove locking pins [5] of legs [F], removing the relative cotter pins [6], to lower the legs to the ground.
5) Turn handwheel [4] again to raise the machine to the maximum height, ensuring that the hole on the leg
supports (SF) is aligned with the 4th hole (starting from the bottom) on each leg [F].
6) Insert locking pins [5] and secure in position by means of cotter pins [6].
7) Remove the lifting foot [1] and position it on the other side of the machine (rear), in the vicinity of the roll bar [7].
8) Lower the lifting foot [1] until the lower bracket [8] can be inserted below the roll bar [7] and centred.
9) Raise the machine by means of the handwheel [4], so that the rear legs [R] no longer touch the ground.
10) Remove locking pins [9] of legs [R], removing the relative cotter pins [10], to lower the legs to the ground.
11) Turn handwheel [4] again to raise the machine until the hole on the leg supports (SR) is aligned with the 4th
hole (starting from the bottom) on each leg [R].
12) Insert locking pins [9] and secure in position by means of cotter pins [10].
13) Remove the lifting foot [1] and use the handwheel [4] to lower the machine until the upper bracket [11] can
be inserted below the roll bar [7] and centred.
14) Raise the machine by means of the handwheel [4], so that the rear legs [R] no longer touch the ground.
15) Remove locking pins [9] of legs [R], removing the relative cotter pins [10], to lower the legs to the ground.
16) Turn handwheel [4] again to raise the machine until the hole on the leg supports (SR) is aligned with the 5th
hole (starting from the bottom) on each leg [R].
17) Insert locking pins [9] and secure in position by means of cotter pins [10].
18) Remove the lifting foot [1] and return to the lateral housing.

Advertisement

loading