Veris 3150 MSP3 Operating Instructions Manual page 36

Table of Contents

Advertisement

To help insure the quality of your data, please follow these guidelines:
1. Generate and view maps frequently, especially prior to deleting data from Instrument.
2. View SoilViewer map frequently during data collecting; watch for:
 Negative readings in the Shallow and Deep or excessive noise in the OpticMapper data.
 Sensor readings should fluctuate gradually as you drive across the field, relating to
soil changes. If readings change erratically, or show values not typical of soil
in the area, perform 4-5 below.
 In SoilViewer, watch for streaks, stripes, unnatural patterns, and missing data points.
3. Perform electrical continuity test on implement wiring:
 at least once a day during mapping season
 every 10 hours of mapping
 after extended periods of non-use
 after replacing or repairing coulter-electrode components or wiring
 whenever readings are questionable
4. Perform EC Signal Testing Procedures #2 and #3:
 at least once a day during mapping season
 every 10 hours of mapping
 after extended periods of non-use
 whenever readings are questionable
5. Perform black/white reference OM System Check and OM Test Load Procedure #1
 Before mapping every field
 Whenever readings are questionable
6. Keep all electrical connections dirt and moisture-free
7. Limit speeds in rough or rocky field conditions. This will improve data quality, and will also
lengthen the service life of the implement components. NEVER EXCEED 15 M.P.H. FIELD
SPEED WHEN MAPPING EC/OM. NEVER EXCEED 7.5 M.P.H. WHEN MAPPING PH.
4-15
Pub. # OM20-MSP3-3D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3210 msp3Msp3-3d

Table of Contents