E2 Lite
(3) The SCP is started.
"TEST1 is running." and "TEST2 is running." are displayed on the screen.
If the emulator correctly completes TEST1 and TEST2, "TEST1: PASS" and "TEST2: PASS" are
displayed on the screen.
(4) The result is displayed when execution of the SCP is completed.
"PASS" appears on the screen after result of the SCP is correct completion.
"PASS" indicates that the SCP has detected no faults in the E2 Lite.
Click on the [QUIT] button to end the SCP.
R20UT3240EJ0300 Rev.3.00
May.15.20
Figure A.5 Starting the SCP
Figure A.6 Correct Completion of the SCP
Appendix A
Page 32 of 36