Icom IC-M94D Instruction Manual page 48

Hide thumbs Also See for IC-M94D:
Table of Contents

Advertisement

9
DSC OPERATION
D Receiving a Test call
NOTE: If the Auto ACK function is set to "Auto," the Test Acknowledgement call is
automatically sent to the calling station when the call is received. (p. 42)
If the function is set to "Manual," the following screens are displayed.
When a Test call is received:
• An alarm sounds.
• "RCVD Test Call" is displayed.
1.
Push
2.
Push the Software Key below for your next operation.
Ignores the call and returns to the operating
:
screen.
(Ignore)
• The call is saved in the DSC Log.
• "
Puts the received call on hold, and returns to the
:
operating screen.
(Hold)
L You can check the DSC calls that are on hold in
Sends a Test Acknowledgement "Able Comply."
:
• The call is saved in the DSC Log.
(Able
Comply)
Accepts the call.
:
• Displays the received call's information.
(Accept)
• The call is saved in the DSC Log.
• Push
• Push
39
to turn OFF the alarm.
" blinks continuously until you display the
call message.
the Unread List. (p. 41)
, and then push
Test Acknowledgement. (p. 32)
to resend.
to send a

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents