2RB/2RC/2RD/2RF/3R6
14. Remove the primary transfer unit (a) in the upper
direction from the process unit frame (b).
IMPORTANT
Take care not to hold the transfer belt when pulling, put
on a flat place.
Figure 4-44
15. Remove FFC (a) of the drum unit from the connec
tor (b) of the unit relay PWB.
16. Release two lock levers (c) and (d) of the drum unit.
17. Remove the drum unit (e) in the direction of the
arrow from the process frame (f).
18. In a similar way remove each color of the drum unit.
IMPORTANT
When removing the drum unit, take care not to touch the
drum.
Figure 4-45
4-24