MECHANICAL INSTALLATION
2–6
Courtesy of NationalSwitchgear.com
KEEP THE HANDLE IN ITS ROTATED
POSITION UNTIL THE DRAW-OUT UNIT
IS INSERTED COMPLETELY
8 - 32X3/8IN P/HD PHIL BLK
GE PART # 1408-0306; (QTY:8)
TIGHTENING TORQUE: 15 IN LB
THE HANDLE MUST BE ROTATED 90
WHILE SLIDING THE 350 DRAW-OUT
UNIT INTO THE CAPTIVE UNIT
PUSH THE HANDLE DOWN AND TIGHTEN
THE SCREW UNTIL THE HANDLE IS PARALLEL
WITH THE FRONT PANEL SURFACE
350 FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL
CHAPTER 2: INSTALLATION
⁰