Connector Diagram - Omron YSC-8361 Instruction Manual

Ac servo system
Table of Contents

Advertisement

2. POWER CONNECTION AND GROUNDING
2.1 Single phase 220V power connection
Green/yellow wire must be connected to the earth.
2.2 Three phase 380V power connection

3. CONNECTOR DIAGRAM

4. OPERATING FIELD P200B
Start tacking
End tacking
Free Sewing
Single start tacking, A is the stitches of forward
sewing; B is the stitches of backward sewing.
They are both in range 1~15
Double start tacking, A is the stitches of
forward sewing; B is the stitches of backward
sewing. They are both in range 1~15。
Single end tacking, C is the stitches of backward
sewing; D is the stitches of forward sewing.
They are both in range 1~15
Double end tacking, C is the stitches of
backward sewing; D is the stitches of forward
sewing. They are both in range 1~15
▲ As the pedal is stepped forward, the start tacking(if
selected) will be done automatically, then machine will
3

Advertisement

Table of Contents
loading

Table of Contents