Fire Alarm And Suppression System; Hp Pod 20C Structure - HP POD 20c Maintenance And Service Manual

Table of Contents

Advertisement

Component to be inspected
Lighting

Fire alarm and suppression system

Component to be inspected
Full system functional check
Fire panel
VESDA
Suppression system

HP POD 20c structure

Component to be inspected
Complete structure
Task
Compare the following with site
indications (if available):
CWS/CWR temperature
CWS/CWR pressure
Flow rate (if possible)
(Investigate discrepancies, trouble
shoot, and replace as necessary.)
POD SHUT DOWN REQUIRED
Calibrate (zero out) POD
differential pressure sensors.
(Investigate discrepancies, trouble
shoot, and replace as necessary.)
Visual inspection of lighting
fixtures and lamps. Replace
components upon failure.
Task
Inspect and perform a functional
check of the system.
Inspect and test fire panel
battery backup system.
Inspect and test VESDA power
supply.
Inspect the VESDA pipe
network.
Inspect the VESDA filter.
Replace as necessary.
Conduct a VESDA pipe integrity
smoke test.
Check the VESDA pipe flow.
Clean the VESDA sampling
points.
Flush the VESDA pipe network.
VESDA system air
sampling/smoke test
Suppression system test
Fire-pull visual and operational
inspection
Fire strobe and horn visual and
operational inspection
Task
Visually inspect the structural
integrity.
Frequency
Capable Party
Annually
Qualified personnel
Annually
Qualified personnel
As needed or
Licensed electrician/
Quarterly
Qualified personnel
Frequency
Capable Party
As required by
Authorized technician
local code
Bi-annually
Authorized technician
Quarterly
Authorized technician
Bi-annually
Authorized technician
Annually
Authorized technician
Annually
Authorized technician
Annually
Authorized technician
Every 2 years
Authorized technician
Every 2 years
Authorized technician
As required by
Authorized technician
local code
As required by
Authorized technician
local code
As required by
Authorized technician
local code
As required by
Authorized technician
local code
Frequency
Capable Party
Annually
Qualified personnel
Periodic maintenance 66

Advertisement

Table of Contents
loading

Table of Contents