Site Preparation - Follett Horizon Elite Chewblet 1010 Series Installation Instructions Manual

For drop-ins
Hide thumbs Also See for Horizon Elite Chewblet 1010 Series:
Table of Contents

Advertisement

Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2 m) of
ice machine in accordance with local and national codes. Outdoor installation
of low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
• 120/60/1–5 amps
Potable water supply
• 10–70 psi (69–483 kpa)
• 45–90 F (7–32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drain
(3/4" Barb)
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4 mm/0,3 m).
Refrigeration lines
• 5/8" ∅ (15,8 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
DROP-IN • RIDE Technology
(3/8" push-in internal connection, 3/8" OD tubing required)
remote condensing

Site preparation

5/8" ∅ (15,8mm)
3/8" ∅ (9,5mm)
NEMA
5-15
1/4" per foot
(6,4 mm per 0,3 m)
2
2 ft. x 1" OD
silicone tubing
and ttings
provided
5

Advertisement

Table of Contents
loading

Table of Contents