STEP 3:
HANDRAILS/DECK
#1-3: Push handrails up through bottom of deck leaving about 3" exposed.
#4: Align the inside/outside
rails with deck/handrail.
#7: Install right and left
ladder bridges.
Tools needed:
Parts needed:
#5-6: Partially slide deck down, locking handrails onto
ladder sections.
#9: Finish
tapping deck
all the way
down until
engaged on to
the bridges.
rubber mallet, cordless drill w/Phillips driver
1- Deck
4- Handrails
1- Left bridge with lock assembly
1- Right bridge
2- #10 x 1-1/4" self tapping screws
2- 1/4 - 20 x 1" machine screws
2- 1/4 - 20 Hex Nuts
#8: Using the 1/4" - 20 x 1"
screws and hex nuts provided,
attach both outside bridge tabs
to the outside ladder rails marked
OL & OR. Insert screws through
the hole on the bridge from the
inside. Fasten with hex nuts on
the outside of rail. It may be
necessary to drill out holes using
5/16" drill bit and cordless drill.
WARNING!
drill near pool may result in
electrocution.
Using a corded
#10: Overlap the
flat sections at
top of the hand-
rails and connect
using 1-#10
x 1-1/4" self
tapping screw.
Repeat for other
handrail.
5
Need help?
Do you have a question about the ROLLGUARD 7200 and is the answer not in the manual?
Questions and answers