INSTALLATION OF PEPSI HIGH SECURITY VALIDATOR GUARD
Parts Required:
1 - 801,306,00x.x1
1 - 801,305,88x.x1
1 – 801,305,89x.x1
1 – 801,305,90x.x1
4 - 800,303,19x.x1
6 - 900,800,67x.x1
Tools Required:
7/16" socket
Drill
Tape
Center punch
NOTE: PLEASE READ ALL INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING WORK.
Instructions:
Note:
Prior to installing the validator guard, ensure that the wide vandal panel has been installed on
the door.
1.
Unplug the vender.
2.
Cut out the appropriate template, the opening for the validator (if required), the four squares for
the carriage bolts, and the two round holes for the studs.
3.
Using the four carriage bolts and tape, secure the template in place and mark the location for
the two studs.
4.
Drill two 5/16" holes in the places marked in step 2. Use caution when drilling to ensure that no
wires are damaged.
5.
Install the validator guard and secure with carriage bolts and nuts. It may be necessary to
temporarily remove the Coinco BA30B control board to gain access to the upper stud.
9/19/02
M036.2
Assembly Guard Bill Validator (Conlux)
Assembly Guard Bill Validator (Coinco)
or
Assembly Guard Bill Validator (Mars)
or
Assembly Guard Bill Validator Opening
and
Bolt, Carriage1/4 - 20 x 5/8 Grade 5
Nut, Keps 1/4 - 20
Ratchet for socket
5/16" drill bit
Phillips screwdriver
Hammer
Page 1 of 5
M036.2
Need help?
Do you have a question about the M036.2 and is the answer not in the manual?
Questions and answers