ADJ PAR Z MOVE RGBW User Instructions page 7

Hide thumbs Also See for PAR Z MOVE RGBW:
Table of Contents

Advertisement

S A F E T Y G U I D E L I N E S
DO NOT TOUCH the fixture housing during operation. Turn OFF the power and allow approximately 15
minutes for the fixture to cool down before servicing.
DO NOT shake fixture; avoid brute force when installing and/or operating fixture.
DO NOT operate fixture if the power cord has become frayed, crimped, damaged and/or if any of the
power cord connectors are damaged and do not insert into the fixture securely with ease.
NEVER force a power cord connector into the fixture. If the power cord or any of its connectors are
damaged, replace it immediately with a new one of similar power rating.
DO NOT block any air ventilation slots; these must remain clean and never blocked. Allow approx. 7.9"
(20cm) between fixture and other devices or a wall for proper cooling.
When installing fixture in a suspended environment, always use mounting hardware that is no less than
M10 x 25 mm, and always attach an appropriately rated safety cable.
ALWAYS disconnect fixture from main power source before performing any type of service and/or
cleaning procedure. Only handle the power cord by the plug end; never pull out the plug by tugging the
wire portion of the cord.
During the initial operation of this fixture, a light smoke or smell may emit from the interior of the fixture.
This is a normal process and is caused by excess paint in the interior of the casing burning off from the
heat associated with the lamp and will decrease gradually over time.
Consistent operational breaks will ensure fixture will function properly for many years. ONLY use the
original packaging and materials to transport the fixture in for service.
7

Advertisement

Table of Contents
loading

Table of Contents