ADJ PAR Z MOVE RGBW User Instructions page 12

Hide thumbs Also See for PAR Z MOVE RGBW:
Table of Contents

Advertisement

INSTALLATION
When installing the unit, the trussing or area of installation must be able to hold 10 times the weight
without any deformation. When installing, the unit must be secured with a secondary safety attachment,
e.g. and appropriate safety cable. Never stand directly below the unit when mounting, removing, or
servicing the unit.
Overhead mounting requires extensive experience, including calculating working load limits, installation
material being used, and periodic safety inspection of all installation material and unit. If you lack these
qualifications, do not attempt the installation yourself. Installations should be checked by a skilled
person once a year.
The Par Z Move RGBW is fully operational in three different mounting positions, hanging upside-down
from a ceiling or trussing, sideways on trussing, or set on a flat level surface. Be sure this fixture is kept
at least 12m (40ft) away from any flammable materials (decoration etc.). Always use and install the
supplied safety cable as a safety measure to prevent accidental damage and/or injury in the event the
clamp fails. Never use the carrying handles for secondary attachment.
12

Advertisement

Table of Contents
loading

Table of Contents