GE CTF878 User & Service Manual page 58

Clamp-on tag flowmeter
Hide thumbs Also See for CTF878:
Table of Contents

Advertisement

February 2009
Installing the Printed
Circuit Board (cont.)
5-6
9. Position the clear plastic LVD shroud over the electrical
connections so that the two holes in the shroud align with the
standoffs on the printed circuit board. Secure the shroud to the
standoffs with the two sets of screws and washers.
10. After carefully checking for and removing any loose hardware in
the enclosure, close the electronics console and reconnect the
main power to the CTF878.
Note: For compliance with the European Union's Low Voltage
Directive (2006/95/EC), this unit requires an external power
disconnect device such as a switch or circuit breaker. The
disconnect device must be marked as such, clearly visible,
directly accessible, and located within 1.8 m (6 ft) of the
CTF878.
Before taking measurements with the CTF878, refer to Initial Setup,
Chapter 3 in the Startup Guide, and to Calibration, Chapter 3 in this
Service Manual, for instructions on properly setting up the meter for
accurate flow rate measurements.
Note: Be sure to enter a complete and detailed account of the service
procedure performed on the CTF878 in Appendix A, Service
Record.
Parts Replacement

Advertisement

Table of Contents
loading

Table of Contents